Site Pictures, 12 April 2005

6 Days until the first ballast cantilever lift

Current Status of the Alidade (note rotated position)

Ballast Cantilever #1

The Crane

The Bogies and Track

The Lower Azimuth Bonnet

The Elevation Axle (for mounting of Ballast #1)

Gear Rim Segments

The Quadrapod

The Reflector (nearly finished)

The Receiver Cabin (note hand rails to 20.7 level)