May 2011 Installing First Light Instruments  | 
July 14-20, 2008 first holography campaign  | 
February 26-27, 2007: elevation work  | 
November 10-22, 2006: inauguration activities  | 
November 9, 2006: more site pictures from elevation move preparations  | 
November 7, 2006: site pictures from elevation move preparations  | 
September 26, 2006: site pictures from azimuth move and bogie alignment  | 
May 4, 2006: panel subframe pieces at INAOE  | 
May 3, 2006: elevation gear and ring one panels  | 
March 14, 2006: elevation move  | 
December 15, 2005: the tetrapod lift  | 
December 6, 2005: telescope without crane support  | 
November 26, 2005: reflector welded in place       | 
November 21, 2005: more pictures after the Big Lift       | 
November 19, 2005: the Big Lift of the reflector       | 
October 18, 2005: the reflector with the tetrapod mounted       | 
April 26-28, 2005: the ballast cantilever lifts       |