LMT/GTM Site Pictures, 22 Feb 2005
General Alidade Picture
West Side Ballast Cantilever. Painted and Ready to Lift
East Side Ballast Cantilever. Primer coat
Lower Alidade Bonnet Trusses and Connetions
Receiver Cabin
Receiver Cabin Detail: Large Beam in Roof of Top Floor
The Containers from the Italian Shipment (2 of 3 have arrived)
Reflector Truss
Tetrapod Upper Section Ground Assembly